
Disassembly, inspection, refurbishment and reassembly of Top Drive and Travelling Block Dollies, with NDT inspection and a full protective coating system.
Complete disassembly, repair and reassembly of the Top Drive and Travelling Block Dollies for the Rowan Mississippi drilling rig, with the focus on mechanical reliability, structural integrity, and quality control at every stage.
A comprehensive mechanical refurbishment for JSA Loadmaster, delivered for the Rowan Mississippi drilling rig at Hamriyah Free Zone, Sharjah. From 09 January to 08 February 2026, the project covered the complete servicing of two dolly frames, including roller assemblies, bearings, pins, isolators and grease lines, all carried out to the client’s technical requirements and Drawing No. 07162.


Scope of Work
The work followed a clear sequence, from full disassembly and inspection through to final reassembly, with quality control and documentation built into every stage.
The refurbishment was completed over one month (09 January – 08 February 2026), with all components serviced, structural welds verified by NDT, coatings checked for dry film thickness, and the assemblies delivered ready for service.
Project Overview
We handled the job from first disassembly to final inspection, keeping mechanical reliability and quality verification at the centre of every step.

Let's Connect
From technical requirements to complete flow control solutions, our team is ready to understand your needs and help you move forward with confidence.